Phone: Company:
Fax: Date Sent:
Requested Date for Start-Up: Phone #:
Fax #:
Y
ES NO
*1.
2.
3.
*4.
*5.
*6.
7.
8.
9.
10. or vapor withdrawal.
11.
*12.
13.
*14.
15.
16.
17.
18.
*19.
20.
Can emergency loads be transferred to generator at start-up?
Remote annunciator wires terminated at generator and ATS.
Fuel supply connected to engine with approved flexible lines.
Battery charger power connected (Do Not Energize Circuit)
Fuel available on-site and ready for testing.
Natural Gas and / or Propane plumbing completed in accordance with manual.
Remote radiator, piping, expansion tanks installed flushed, filled with coolant.
Remote start wires terminated at generator and ATS.
Intake and exhaust louvers installed and operational.
Engine coolant heater connected to utility (Do Not Energize Circuit)
Return to:
Fuel day tank power connected. (Do Not Energize Circuit)
* Items 1, 4, 5, 6, 12, 14 & 19 - Referenced wiring must be terminated without exception. CNI is not allowed by
RCW 19.28 , WAC 296-46A & WAC 296-401B to initially terminate this wiring. Once terminated, CNI can change or
correct the wiring.
Recommended fuel line material for diesel systems is schedule 40 black iron pipe.
Recommended exhaust pipe material is schedule 40 black iron pipe.
Exhaust system installation complete including all piping and insulation.
All interconnect wiring must be installed per Cummins Power Generation interconnect wiring drawing recommendations.
Exhaust Piping:
Fuel Plumbing:
Interconnect Wiring:
Generator and isolators mounted to pad properly.
Radiator discharge air exhaust duct installed.
Generator battery / batteries on site. (Do Not Energize Circuit)
Other:
Please fill out this form accurately. If the equipment is not ready for start-up and testing, the installer will be
responsible for all costs associated with the initial site visit. Start-up services will not be performed by Cummins
Northwest, unless this form is returned a minimum of two business days before scheduled start-up.
Utility power available and connected to ATS / MTS (Don't connect door plug to harness)
Please review your installation and respond to the check list below:
Checklist Completed by:
Propane tank set up for liquid
GENERATOR START-UP CHECK LIS
T
Project Name / #:
Owner / Tenant has been notified of the start-up date.
Generator mainline circuit breaker connected to ATS / MTS
Cummins Northwest, LLC
811 SW Grady Way
Renton, WA 97801
(800)274903360 fax: (425)235-8202
Form #100804 rev 4/06